Zum Inhalt springen

Lounge: Unterschied zwischen den Versionen

Diagramme sind gut!
Keine Bearbeitungszusammenfassung
 
(14 dazwischenliegende Versionen von 5 Benutzern werden nicht angezeigt)
Zeile 1: Zeile 1:
empty space, threatening void
empty space, threatening void, soon to become the [[Teehaus]]
 
= Declassified Information (written by the machines) =
 
The Moth War, also known as the Metalab Moth Infestation, was a conflict that occurred at the hackerspace metalab in the second half of 2022. The war was sparked by a sudden influx of moths in the lounge area, causing concern among the members of metalab.
 
The first line of response was led by Lt. [REDACTED] and Maj. Gen. [REDACTED], who implemented a scorched earth policy of removing and destroying all upholstered furniture in the lounge. This initial action was successful in reducing the number of moths, but it also left the lounge area barren and unusable.
 
In an effort to further combat the infestation, Pvt. [REDACTED] initiated a biological warfare campaign, releasing ichneumonids, predatory insects, into the lounge, and while it was initially successful in reducing the moth population, the moths quickly adapted and the campaign was ultimately fruitless.
 
Faced with a growing moth population, Maj. Gen. [REDACTED] decided to escalate the conflict by implementing a full-on chemical warfare campaign. Using powerful pesticides, she was able to eradicate the majority of the moths, finally bringing the war to a successful end.
 
The lounge area was left in a state of disarray, with many members expressing concern over the potential health and environmental effects of the chemical warfare campaign. Despite these concerns, the members of metalab were determined to rebuild the lounge, with the goal of creating a space that was even better than before.
 
As of now, the lounge is still in the early stages of renovation, with members working tirelessly to rebuild and improve the space. In the aftermath of the Moth War, metalab implemented stricter policies for pest control, ensuring that such an infestation would never occur again. The lounge is expected to reopen in the near future, with many members looking forward to enjoying the newly renovated space.
 
The Moth War serves as a cautionary tale of the potential consequences of allowing pests to go unchecked, and the importance of taking swift and decisive action in the face of such a threat.
 
 
 
 
 
 
[[Datei:Lounge_under_construction.jpeg|frame|Current State of the Lounge]]
[[Datei:Lounge_under_construction.jpeg|frame|Current State of the Lounge]]


Zeile 87: Zeile 65:
| cut out old electrics as close to walls as possible || || || ✅
| cut out old electrics as close to walls as possible || || || ✅
|-
|-
| widen door || gains/feasability/risks for accessibility improvements || [[User:ripper|ripper]] || 10%
| widen door || gains/feasability/risks for accessibility improvements || [[User:ripper|ripper]] ||
|-
|-
| flatten historical floor || || || ✅
| flatten historical floor || || || ✅
Zeile 111: Zeile 89:
| Fill holes in new floor || Use some Nivelliermasse || ncl, lasi, ... (you?), thx to ripper for explanation || ✅
| Fill holes in new floor || Use some Nivelliermasse || ncl, lasi, ... (you?), thx to ripper for explanation || ✅
|-
|-
| Flatten/grind down high spots on new floor || rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961 || ||
| Flatten/grind down high spots on new floor || rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961 || ||
|-
|-
| replaster wall(s) ? || yes / no || ||
| replaster wall(s) ? || yes / no || lasii und badpractice ||
|-
|-
| paint walls || || ||
| Wand zum Hauptraum stabilisieren || OSB regelt || luto und ripper ||
|-
|-
| lay new floor || Which floor (Laminat/PVC/Epoxy??) || ||
| paint walls and ceiling || || luto ||
|-
|-
| decide on room layout || ladders / seating / eqipment || ||
| Kabeltrassen wieder montieren || || luto und ripper ||
|-
|-
| rebuild ladders || ladder requirements, ladder design || ||
| lay new floor || Which floor (Laminat/PVC/Epoxy??) || luto und qchen ||
|-
|-
| rebuild electricals using Kabeltrassen || requirements || ||
| decide on room layout || ladders / seating / eqipment || qch3n ||  
|-
|-
| rebuild networking using Kabeltrassen || requirements || ||
| rebuild ladder || ladder requirements, ladder design || ripper || 10%
|-
|-
| rebuild lighting || || ||
| rebuild electricals using Kabeltrassen || requirements || || ✅
|-
| rebuild networking using Kabeltrassen || requirements || nichtda ||  ✅
|-
|repaint windows/door in RAL 6011 Resedagrün
|one or two coats?
|ncl, ivy
|60%
|-
| rebuild lighting || || johanna und luto ||
|-
|-
| acquire furniture || || ||
| acquire furniture || || ||
|-
| Türschwelle || || ripper || 10%
|-
| Schuhregal || || ||
|-
| (Paletten-)Polster einsammeln || || ||
|-
| Palettensofa bastellen || || ||
|-
| Audio Setup || || ||
|-
| Verkabelung Video Setup || || ||
|-
|-
| redo lounge setup || requirements || ||
| redo lounge setup || requirements || ||
Zeile 261: Zeile 260:


=== Electrics ===
=== Electrics ===
[[Datei:Elektrik alt 2023-01-23 10-34-19.jpg|rahmenlos|links|aaaaaaaaaaah]]
 
[[Datei:Elektrik alt 2023-01-23 10-34-19.jpg|rahmenlos|aaaaaaaaaaah]]


lol.
lol.
=== Walls ===
==== Verputz, Schleif und Anmalaktion für Lounge und Küche 2025-01-25 & 26 ====
Was ist zu tun (Lounge)?
* Grobe Löcher zuspachteln
* eventuell grobe Stellen von alten Putz abschleifen
* Putz auf Wand auf tragen und möglichst gerade abziehen
* Putz wenn getrocknet abschleifen
* zwei Farbschichten auftragen
Was ist zu tun (Lounge/Hauptraum-Wand)?
* OSB-Platten draufspaxen
* Fermacell-Platten daruftrockenbauwandschrauben
* Spachteln
* Schleifen
* ausmalen (2x)
Was ist zu tun (Küche)?
* Küche im hinterern Teil ausräumen (was offen steht)
* abkleben (Vorbereitung fürs ausmalen)
* Löcher spachteln
* ausmalen (2x)
Was brauchen wir?
* weiße Farbe (im Lab)
* Putz
* Putzkellen
* Spachtelmasse
* Spachteln (im Lab)
* Malerkrepp und Folien (im Lab)
* Malerrollen
** 1 große und kleine (lasii)
** min 1 weitere große Rolle
Dinge die Vorab zu erledigen sind:
* alte Loungewand von Dingen befreien
* Spachtel und Verputzmasse besorgen (lasii)
* Kabeltrassen vorsichtig abmontieren und lagern
* Allen Strom entfernen. Achtung, nicht die zwei einzelnen Kabel für die Lüftung.
Grober Zeitplan
Samstag 2025-01-25
* zuspachteln und schleifen (passiert vllt vorher)
* Putz auftragen (muss über Nacht trocknen)
* Küche ausräumen, abkleben und Löcher verspachteln
Wer ist dabei?
* lasii
* Alice
*
* Du?
Sonntag 2025-01-26
* Putz abschleifen falls notwendig
* Es wird gemalt (jeweils zwei Schichten)
* und zusammengeräumt
Wer ist dabei?
* lasii
* Alice
*
* Du?
==== Wandstabilisierung (Hauptraumwand) ====
Auf die Wand aus Schlackebetonziegeln (angeblich??) sind 2 Lagen aus lecker OSB-Verlegeplatten (je 15mm) angebracht. die erste Platte mittels Spax und Dübeln in die Wand, die zweite Lage mit Spax in der darunter liegenden verankert.
[[Datei:Lounge OSB wand.jpg|alternativtext=Eine Wand mit einer Tür darin, sie ist komplett mit OSB-Platten verkleidet.|500px]]