Electricity & Lighting: 3rd beacon in place
Fin (Diskussion | Beiträge)
 
(3 dazwischenliegende Versionen von einem anderen Benutzer werden nicht angezeigt)
Zeile 142: Zeile 142:
  |-
  |-
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |98% (?)
  |100%
  |([http://www.orion.co.at/de/docs/stores/at/w1070.htm source for library/WEL lamps])
  |([http://www.orion.co.at/de/docs/stores/at/w1070.htm source for library/WEL lamps])
  |-
  |-
  |Build
  |Build
  |98% (?)
  |100%
  |Done: 3 beacons
  |
  |-
  |-
  |Final touch
  |Final touch
  |  
  | 100%
  |
  |
|}
|}


= Plans & Ideas for Further Phases =
= Further Phases =
 
* Outlets in the left part of the lab (from corner of Heavy Machinery to Fotolab and from Fotolab to the entrance)
 
 


* Make heavy machinery lab closable to limit dust -> done (new room)
* More outlets in the remaining corners of the lab -> partially done
* Permanent network cabling -> done
* More (and orderly) shelving
* Fixed and labeled positions for oszis, soldering stations, etc
* Stairs to the big window (since Hvy Mchnry exit will be unusable for a while)