Lounge: Unterschied zwischen den Versionen

aus Metalab Wiki, dem offenen Zentrum für meta-disziplinäre Magier und technisch-kreative Enthusiasten.
Zur Navigation springenZur Suche springen
(Implementation + responsibity)
(Diagramme sind gut!)
 
(37 dazwischenliegende Versionen von 12 Benutzern werden nicht angezeigt)
Zeile 83: Zeile 83:
 
| remove lower border of street-side plaster || || || ✅
 
| remove lower border of street-side plaster || || || ✅
 
|-
 
|-
| bring floor-components and other trash to relevant mistplatz || || || 90%
+
| bring floor-components and other trash to relevant mistplatz || || ||
 
|-
 
|-
 
| cut out old electrics as close to walls as possible || || || ✅
 
| cut out old electrics as close to walls as possible || || || ✅
 
|-
 
|-
| widen door ? || gains/feasability/risks for accessibility improvements || || 10%
+
| widen door || gains/feasability/risks for accessibility improvements || [[User:ripper|ripper]] || 10%
 
|-
 
|-
 
| flatten historical floor || || || ✅
 
| flatten historical floor || || || ✅
 
|-
 
|-
| remove floor dust || special equipment needed ? || ||
+
| remove floor dust (the sooner the better)|| special equipment needed ? || ||
 
|-
 
|-
| fill up gaps under walls / wooden "cable tray" || || ||
+
| fill up gaps under walls / wooden "cable tray" (the sooner the better) || || [[User:Nicole|ncl]]|| ✅
 
|-
 
|-
| build a concrete slide to get concrete from the truck into the lounge ||  || ||
+
| build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest )||  || [[User:ripper|ripper]] || ✅
 
|-
 
|-
| organize tools (Abziehlatte, 3 Shovels, kellen) || || ||
+
| organize tools (Abziehlatte, 3 Shovels, kellen, wood sheet to walk on drying beton) || || [[User:ripper|ripper]] ||  ✅
 
|-
 
|-
| tell the Vermieter || what exactly to tell them || ||
+
| clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) || || ||
 
|-
 
|-
| clear the corner in the main room, palce plastic tarp, make a dirt-schleuse || || ||
+
| cover walls with tarp to protect them from concrete splashes (the sooner the better)|| || ||
 
|-
 
|-
| cover walls with tarp to protect them from concrete splashes || || ||
+
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || piro ||
 
|-
 
|-
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || ||
+
| order the concrete || || [[User:ripper|ripper]] || ✅
 
|-
 
|-
| order the concrete || || [[User:ripper|ripper]] ||
+
| pour new floor || || [[User:ripper|ripper]] ||
 
|-
 
|-
| pour new floor || || [[User:ripper|ripper]] ||
+
| Fill holes in new floor || Use some Nivelliermasse || ncl, lasi, ... (you?), thx to ripper for explanation || ✅
 +
|-
 +
| Flatten/grind down high spots on new floor || rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961 || ||
 
|-
 
|-
 
| replaster wall(s) ? || yes / no || ||
 
| replaster wall(s) ? || yes / no || ||
 +
|-
 +
| paint walls || || ||
 +
|-
 +
| lay new floor || Which floor (Laminat/PVC/Epoxy??) || ||
 
|-
 
|-
 
| decide on room layout || ladders / seating / eqipment || ||
 
| decide on room layout || ladders / seating / eqipment || ||
Zeile 131: Zeile 137:
 
=== Floor ===
 
=== Floor ===
 
==== Estrichaktion 2024-03-07 ====
 
==== Estrichaktion 2024-03-07 ====
Am 7. März um 15:00ish wird geestricht. Dazu brauchen wir viele leute und Werkzeug. Außerdem muss dafür einiges vorbereitet werden (siehe weiter oben). Tätigkeiten sind unter anderem:
+
tnx an [[User:ripper|ripper]], [[User:Nicole|ncl]], [[User:M3lt|Felix]], [[User:becca|becca]], piro, [[User:amalia|amalia]], [[User:neuron|neuron]] und alle anderen die dabei geholfen haben
* Beton schaufeln
 
* Beton abziehen
 
* Werkzeuge handeln (Leuten in der Lounge übergeben)
 
* Werkzeuge putzen
 
* Mit der Betonfirma reden
 
* Essen machen, Getränke
 
* Wegräumen, Betonreste beseitigen
 
* Standby für eventuellen Estrichnachkauf
 
  
Wer ist dabei:
+
==== Auffüllen&Schleifen ====
{| class="wikitable"
+
Der Boden ist sooo schief (Daten aus [[Datei:Lounge.xlsx]]):<br>
|-
+
{|
! Wer? !! Kann physische Arbeit !! Kommentar
+
! Vor Schleifen !! nach Schleifen
|-
 
| [[User:ripper|ripper]] || {{Yes}} || -
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
 
|-
 
|-
| Du? || {{Yes}} / {{No}} || Nomnom Beton
+
| [[Datei:Loungeboden_warped_1.png|500px]] || [[Datei:Loungeboden_less_warped_1.png|500px]]
 
|-
 
|-
| Du? || {{Yes}} / {{No}} || Nomnom Beton
+
| [[Datei:Loungeboden_warped_2.png|500px]] || [[Datei:Loungeboden_less_warped_2.png|500px]]
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
|-
 
| Du? || {{Yes}} / {{No}} || Nomnom Beton
 
 
|}
 
|}
  
 +
Daher:
 +
# Löcher mit Ausgleichsmasse/Nivellierspachtel auffüllen (wurde am 22.05.2024 erledigt)
 +
# Boden Schleifen
 +
 +
Mit etwas Glück sollte der Boden nicht mehr als 1 bis 1,5cm schief von der Tür bis zur Galaxiwand sein. Und dabei gerade von Rathausstraße zum Blinkentunnel sein.
 +
 +
==== Boden Fräsen Freitag 11.-Montag 14. Oktober 2024 ====
 +
 +
Wir müssen [https://www.boels.com/de-at/mieten/bodenfraese-230-v/p/10961 eine Fräse] ausborgen, ins Metalab bringen, fräsen und das Gerät zurück bringen.
 +
* Fräse Reserviert (done)
 +
* Abholung Freitag ab 14:00 - 17:00 (offen)
 +
* Schleifen am Samstag (und/oder Sonntag?) - offen
 +
* Zurückbringen am Montag vor 8:00 (offnet um 7:00) (offen)
 +
 +
'''Den Orga Hut trägt [[Benutzer:Sonstwer|Sonstwer]]'''
 +
 +
=====Wer ist dabei=====
 +
Freitag:
 +
Es braucht 1 Auto, eine Person mit Führerschein und Personen, die beim Ein- und Ausladen zu helfen
 +
 +
* [[User:lasii|lasii]] - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
 +
* Dein Name - Deine Mithilfmöglichkeit
 +
 +
Samstag:
 +
Es braucht mindestens ca 4 Personen, die mithelfen das Gerät zu bedienen
 +
 +
* [[User:emnichtda|Zoe]]
 +
* [[User:Sonstwer|Sonstwer]]
 +
* Dein Name
 +
* Dein Name
 +
* Dein Name
 +
 +
Sonntag:
 +
Wir hoffen am Samstag schon fertig zu werden, aber falls nicht:
 +
 +
* [[User:emnichtda|Zoe]]
 +
* [[User:Sonstwer|Sonstwer]]
 +
* Dein Name
 +
* Dein Name
 +
* Dein Name
 +
 +
Auch braucht es Hilfe beim Rückverladen in ein Transportfahrzeug
 +
 +
Montag:
 +
 +
Wir brauchen eine*n Held*in, der/die das Gerät bis 8 Uhr früh zurück bringen kann (frühestens 7 Uhr)
 +
 +
* [[User:lasii|lasii]] - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
 +
* Dein Name
 +
 +
Adresse: Boels Maschinenverleih Österreich GmbH Wien - Brunn am Gebirge
 +
 +
Johann-Steinbock-Str. 14
 +
2345 Brunn am Gebirge
 +
Tel +43 (0)2236-312460
 +
Depot.327@boels.at
 +
 +
Auftragsnummer: 3270124114
  
 
==== Boden eben ====
 
==== Boden eben ====

Aktuelle Version vom 20. November 2024, 19:36 Uhr

empty space, threatening void

Declassified Information (written by the machines)

The Moth War, also known as the Metalab Moth Infestation, was a conflict that occurred at the hackerspace metalab in the second half of 2022. The war was sparked by a sudden influx of moths in the lounge area, causing concern among the members of metalab.

The first line of response was led by Lt. [REDACTED] and Maj. Gen. [REDACTED], who implemented a scorched earth policy of removing and destroying all upholstered furniture in the lounge. This initial action was successful in reducing the number of moths, but it also left the lounge area barren and unusable.

In an effort to further combat the infestation, Pvt. [REDACTED] initiated a biological warfare campaign, releasing ichneumonids, predatory insects, into the lounge, and while it was initially successful in reducing the moth population, the moths quickly adapted and the campaign was ultimately fruitless.

Faced with a growing moth population, Maj. Gen. [REDACTED] decided to escalate the conflict by implementing a full-on chemical warfare campaign. Using powerful pesticides, she was able to eradicate the majority of the moths, finally bringing the war to a successful end.

The lounge area was left in a state of disarray, with many members expressing concern over the potential health and environmental effects of the chemical warfare campaign. Despite these concerns, the members of metalab were determined to rebuild the lounge, with the goal of creating a space that was even better than before.

As of now, the lounge is still in the early stages of renovation, with members working tirelessly to rebuild and improve the space. In the aftermath of the Moth War, metalab implemented stricter policies for pest control, ensuring that such an infestation would never occur again. The lounge is expected to reopen in the near future, with many members looking forward to enjoying the newly renovated space.

The Moth War serves as a cautionary tale of the potential consequences of allowing pests to go unchecked, and the importance of taking swift and decisive action in the face of such a threat.




Current State of the Lounge

ReLounge

Use Cases

  • video consumption
  • audio consumption
  • video games
  • quick in/out hopping (Spaziergang time)
  • slacking
  • laptop time
  • board games
  • jamming

Requirements

  1. accessibility
    1. door width
    2. ladder access
    3. furniture arrangement (seating / tables)
  2. cozyness
    1. furniture type
    2. lighting mood
  3. versatility
    1. light mood sellectivity
    2. audio setup connectivity
    3. table surface accesssibility
  4. grind-resistance
    1. seamless floor

Implementation

0% -> ready to start

1-99% -> in progress

✅ -> done

todo
Item known unknowns Responsible
remove garbage
move equipment out where can the equipment be stored ?
tear down electricals & network garbage management
tear down ladders & wood paneling behind them
disconnect & remove lounge radiator
remove wet (moldy?) street-side plaster
remove rubble
clean up brick dust
tear out floor
remove lower border of street-side plaster
bring floor-components and other trash to relevant mistplatz
cut out old electrics as close to walls as possible
widen door gains/feasability/risks for accessibility improvements ripper 10%
flatten historical floor
remove floor dust (the sooner the better) special equipment needed ?
fill up gaps under walls / wooden "cable tray" (the sooner the better) ncl
build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest ) ripper
organize tools (Abziehlatte, 3 Shovels, kellen, wood sheet to walk on drying beton) ripper
clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest)
cover walls with tarp to protect them from concrete splashes (the sooner the better)
Parkplatz vor dem Lab blockieren Mit MA reden, beantragen, etc. piro
order the concrete ripper
pour new floor ripper
Fill holes in new floor Use some Nivelliermasse ncl, lasi, ... (you?), thx to ripper for explanation
Flatten/grind down high spots on new floor rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961
replaster wall(s) ? yes / no
paint walls
lay new floor Which floor (Laminat/PVC/Epoxy??)
decide on room layout ladders / seating / eqipment
rebuild ladders ladder requirements, ladder design
rebuild electricals using Kabeltrassen requirements
rebuild networking using Kabeltrassen requirements
rebuild lighting
acquire furniture
redo lounge setup requirements


Floor

Estrichaktion 2024-03-07

tnx an ripper, ncl, Felix, becca, piro, amalia, neuron und alle anderen die dabei geholfen haben

Auffüllen&Schleifen

Der Boden ist sooo schief (Daten aus Datei:Lounge.xlsx):

Vor Schleifen nach Schleifen
Loungeboden warped 1.png Loungeboden less warped 1.png
Loungeboden warped 2.png Loungeboden less warped 2.png

Daher:

  1. Löcher mit Ausgleichsmasse/Nivellierspachtel auffüllen (wurde am 22.05.2024 erledigt)
  2. Boden Schleifen

Mit etwas Glück sollte der Boden nicht mehr als 1 bis 1,5cm schief von der Tür bis zur Galaxiwand sein. Und dabei gerade von Rathausstraße zum Blinkentunnel sein.

Boden Fräsen Freitag 11.-Montag 14. Oktober 2024

Wir müssen eine Fräse ausborgen, ins Metalab bringen, fräsen und das Gerät zurück bringen.

  • Fräse Reserviert (done)
  • Abholung Freitag ab 14:00 - 17:00 (offen)
  • Schleifen am Samstag (und/oder Sonntag?) - offen
  • Zurückbringen am Montag vor 8:00 (offnet um 7:00) (offen)

Den Orga Hut trägt Sonstwer

Wer ist dabei

Freitag: Es braucht 1 Auto, eine Person mit Führerschein und Personen, die beim Ein- und Ausladen zu helfen

  • lasii - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
  • Dein Name - Deine Mithilfmöglichkeit

Samstag: Es braucht mindestens ca 4 Personen, die mithelfen das Gerät zu bedienen

Sonntag: Wir hoffen am Samstag schon fertig zu werden, aber falls nicht:

Auch braucht es Hilfe beim Rückverladen in ein Transportfahrzeug

Montag:

Wir brauchen eine*n Held*in, der/die das Gerät bis 8 Uhr früh zurück bringen kann (frühestens 7 Uhr)

  • lasii - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
  • Dein Name

Adresse: Boels Maschinenverleih Österreich GmbH Wien - Brunn am Gebirge

Johann-Steinbock-Str. 14 2345 Brunn am Gebirge Tel +43 (0)2236-312460 Depot.327@boels.at

Auftragsnummer: 3270124114

Boden eben

der Boden sollte eben sein, und eingermassen auf gleicher Höhe wie der Boden der Bib, damit wir einen Barrierearmen Boden haben wenn wir irgendwann den Hauotraumboden neu gemacht haben...

Das Problem dabei ist, dass der historische Estrich sehr uneben und teilweise sehr knapp am niveau der Bib dran (oder sogar knapp drüber) ist.

Höchster Punkt Bib +1 cm einzelne Punkte, wegstemmen, rot markiert
Höchste Fläche Bib -2 cm
Durchschnitt Bib -3.5 cm
Niedrigster Punkt Bib -6 cm

Serviervorschlag 2

Estrichboden

Abschätzung Beton/Estrich der rein muss:

  • Grundfläche von 5,3x4,03m --> 21,36m²
  • Mittlere Dicke ca. 7cm --> 1,5m³ Beton
  • Estrichbeton von Obi hat eine Dichte von 2000kg/m³ --> 3000kg Estrich
  • --> 75 Säcke á 4€ --> 300€ für Estrich

Serviervorschlag 1

Lounge Grundfläche ca. 22 m²

Bodenauswahl bei obi

15-30 euro / m² stark beanspruchbares Laminat bei Obi -> ca 330-660 euro bodenlaminat (9mm?)

2 - 4 € /m² "laminatunterlage" bei OBI -> 44 - 88 € / 22m²

darunter spanplatten platte bei obi -> ca 374,- / 22m²

eventuell noch quertráger austauschen/erweitern

bodenaufbau historisch

querträger alle ca 50cm, ein bissl festgeestriccht

darauf schaumstoffbahnen

darauf spanplatten ca 22mm

darauf trittschutz ca 1-2mm blauer kram

darauf laminat ca 9mm

Electrics

aaaaaaaaaaah

lol.