CCCamp2023
Language: | English |
---|
CCCamp2023 | |
August 2023 | |
ripper, du?, ... | |
Camp | |
planning | |
Zelten in Mildenberg | |
Zuletzt aktualisiert: | 29.08.2023 |
The next iteration of Chaos Communication Camp Camps –
- When: from Tuesday the 15th to Saturday the 19th of August 2023
- Where: Ziegeleipark Mildenberg, Ziegelei 10, 16792 Zehdenick "near" Berlin, Germany
- Wiki:
- Tickets:
Discussion happens in this Matrix channel!
Ideas and organization in Etherpad!
Who
Camp inhabitants | means of travel | arrival/departure | plans and projects? | Ticket? |
---|---|---|---|---|
Eisbaer | BE (Licence only) | buildup/teardown | Dome | ✔ |
Cube | train | buildup (sat evening), teardown (sun afternoon) | TBD | ✔ |
ripper | Dometransporter | buildup/teardown (Saturday to Sunday?) |
Dome | ✔ |
Columbia19 | Nachtzug | 2023-08-14 (noon-ish) / 2023-08-17 | ✔ | |
MacLemon | Nachtzug | 2023-08-14 (noon-ish) / 2023-08-20 (noon) | ✔ | |
anlumo | OS229 / OS236 | 2023-08-14 / 2023-08-19 | ✔ | |
overflo | auto | 12.8. early - 20.8. late | chaishop-dome & talk | ✔ +1 extra |
VT100 | eigener VW-Bus (voll) | vmtl 12.8. to 21.8. | ✔ | |
lydschi | fährt mit im ogn VW-Bus | vmtl 12.8. to 21.8. | ✔ | |
Zem | train + kayak | buildup, possibly teardown | arriving by kayak, proof possibility of HF operation | ✔ |
AndiS | Transporter | buildup/teardown | Village Infrastruktur | ✔ |
min | ✔ | |||
max | train probably | ✔ | ||
eesti | train | tbd | tbd | ✔ |
badpractice | train | tbd | tbd | ❔ |
Jackie | car (already full) | 13.8. to 20.8. | ✔ | |
ncl | hab B Schein, sonst Flixbus | bissi buildup, bissi teardown | ✔ | |
becca | train | Ankunft Sa 12.8 Abend, Abfahrt am 20.8 Abend | tbd | ✔ |
piro | train | Ankunft Sa 12.8 Abend, Abfahrt 20.8 | tbd | ✔ |
consti | car (overflo) | buildup/teardown | ✔ | |
André | car | ✔ | ||
joli with kids | car with camper | mo-so | 3d printed sound systems, fun, amateur radio | ✔ |
Hetti | 🚐 | Sa-So | Talk about the Coffee Machine | ✔ |
qch3n | train | 12. - 20. | c3awareness | ✔ |
Aron | FlixBus | 15.08. früh - 19.08. später Nachmittag | ✔ | |
bert | cz | 12.08 später Abend - 20.08 später Nachmittag | tbd | ✔ |
Magnus | Zug | WE bis WE | - | ✘ |
nico | auto | 13-sonntag | ✔ | |
Isa | auto | 13-sonntag | ✔ | |
TheNewCivilian | Zug | 12-samstag / ? | ✔ | |
Jade | probably train | tbd | tbd | ✔ |
wizard23 | Zug | 12.08 später Abend - 20.08 Nachmittag | chillax | ✔ |
lupo | Zug | 15.08. Ankunft mittags - 19.08. Abreise mittags | ✔ | |
gladiola | Zug | 15.08. Ankunft mittags - 19.08. Abreise mittags | ✔ | |
fbr | otter | 11. - 21. | ✔ | |
Ha1r | tba | tba | ✔ | |
Anja | Zug | 15. - 20.8. | ✔ | |
Kendra pendragon | Zug | 12.08 (Abreise Abend, Ankunft 13.8. Mittags? - 20.08 Nachmittag | chillax | ✔ |
Tatz | Zug | 13.08. Ankunft morgens - 20.08. Nachmittag | ✔ | |
Oli +1 | Auto | 2023-08-15 | ✔ | |
you? | ✘ |
Carsharing and driving licenses
Person | License | arrival/departure | Car? |
---|---|---|---|
Eisbaer | ABE (Licence only) | buildup/teardown | fahre alles bis 2x 3,5t |
Hetti | B | buildup/teardown eventually | up for driving |
overflo | B/C | buildup/teardown fix, | brummbrumm |
Kayak Travelling Plans
Departure IC92 Vienna Main Station Friday 14th 19:20 Arrival in Fuerstenberg the next Morning. Travel by Kayak to Mildenberg. About 2-3 Days (includin Camp Out), arrival on Sunday evening or Monday morning at the Camp site.
Travel back from Mildenberg to Zedenik schould be possible in a few hours. Travel back via IC94 to Vienna Main station through the Night.
Persons participating | Notes |
---|---|
Zem | 2 Extra Kayak seats Available |
Cube |
Things to transport
Village-Dinge:
Thing to transport | Size | Weight | Contact |
---|---|---|---|
THING | cm x cm x cm | x kg | You? |
Telefonzelle | ??? | ??kg | |
Dome | TBD | 500 kg | ripper |
Dome Planen | TBD | TBD | cube |
Seile bei den Dome Planen in 1x lang und 1xrot | TBD | TBD | cube |
C3W-Zelt | mehrere Taschen, Maximale Länge 200mm | 200 kg | C3W |
TBD | 8+?kg | Metalab | |
Metalab Beachflag | TBD | 5kg | Metalab |
C3W Beachflag | TBD | 5kg | C3W |
12x Knopparps (zerlegt) | TBD | 12x19kg | ripper |
Kaffeehaus-Equipment | 2 × Eurobox 60×40×12cm + 1 × Eurobox 60×40×33cm; alle mit Deckel, stapelbar; Rest in Eurobox von Columbia+MacLemon | 15kg | |
Feldtelefonvermittlung | 20 x 30 x 100cm | 20kg | cube |
3x Eurobox-Tische | ?? | 3x??kg | ripper |
Kaffeemaschine(n) - Welche? | ??? | ??kg | |
Stromkabel und Verteiler-Schwammerl | ??? | ??kg | |
Boxen aus der Bibliothek für Dome-Audio | ??? | 2x??kg | |
Sticker und Flyer | ??? | ??kg | ripper |
Netzwerk-Equipment | ??? | ??kg | |
Kühlschrank aus dem Keller | ??? | ??kg | |
Kunststoffregal aus dem Keller | ??? | ??kg | |
Sackrodel | ??? | ??kg |
Private Dinge:
Thing to Transport | Size | Weight | Owner |
---|---|---|---|
Brompton | 60 x 60 x 30cm | 13kg | zem |
Bicycle Trailer (can be used for logistics) | 80 x 100 x 40cm | 10kg | zem |
Kayak Stick Bag | 120 x 30 x 30cm | 20kg | zem |
Kayak Skin Bag | 120 x 60 x 40cm | 20kg | zem |
TRX Elecraft K2 | 30 x 30 x 15cm | 2kg | zem |
Zelt | 178 x 21 x 21cm | ? | anlumo |
Liege | 85 x 80 x 25cm | ? | anlumo |
Fahrradtasche | 78 x 63 x 30cm | 20kg | anlumo |
Klapptisch | 62 x 61 x 10cm | 8kg | anlumo |
Klappsessel | 66 x 17 x 17cm | ? | anlumo |
solarbox.one | 40 x 35 x 20cm | 16kg | anlumo |
Solarpanels | 114 x 53 x 20cm | 7kg | anlumo |
Schlafsack | 45 x 30 x 30cm | 2.5kg | anlumo |
Amazon-Box (overflow) | 35 x 28 x 17cm | ? | anlumo |
Fahrrad-Werkzeugkoffer | 31.5 x 25 x 8cm | 3kg | anlumo |
Werkzeugkoffer | 47.5 x 39.2 x 11cm | 9.46kg | anlumo |
Fahrradtasche | 44 x 19 x 27cm | ? | anlumo |
3x Aufbewahrungsbox Bi L | 28 x 55 x 35cm | ? | anlumo |
Gacha-Automaten | 125x48x60cm | ??kg | ripper |
Sibley Bell Tent (übertrieben großes Zelt) | 112x37x30 cm | 35kg | Bobschi + Merete |
Kopak Matte | 120x40x40cm | 10kg | Bobschi + Merete |
Zelt | 65x25x25cm | 9kg | MacLemon + Columbia19 |
2×Campingsessel | 70x24x12cm (gesamt) | 6kg (gesamt) | MacLemon + Columbia19 |
Eurobox (inkl. Kaffeehaus Zeug) | 60x40x30cm | 15kg | MacLemon + Columbia19 |
campingsessel grün | 80x25x25cm | 1kg | fbr |
euronorm box grau | 60x40x42cm | 10kg | fbr |
Zelt | 64×16×16cm | Error 404: Messegrät unavailable | eest9 |
Tasche | 55×40×30cm | Error 404: Messegrät unavailable | eest9 |
Schlafsack | 38×20×20cm | Error 404: Messegrät unavailable | eest9 |
Luftmatratze | 40×27×7cm | Error 404: Messegrät unavailable | eest9 |
Wurfzelt | 60 x 60 x 10 cm | 3kg | Aron (!Es steht Zem drauf!) |
Tasche | 26 x 26 x 28 cm | ca. 3,5 kg | Aron |
Isomatte | 11 x 11 x 28 cm | 0,5 kg | Aron |
North Face Tasche | 80 x 50 x 40 cm | 26kg | Tatz |
Zelt "Wasserdichtes Iglo Doppelzelt" grau-silber | 65 x 20 x 20 cm | Wizard23 + Kendra Pendragon P.P. | |
Schwarze Tasche "Soft" mit pinkem Ducktape und Gürtel umwickelt | 70 x 35 x 35 cm | Wizard23 + Kendra Pendragon P.P. | |
Popup Zelt Galaxy rot mit Sternen | 75 x 8 (Dicke) cm | Wizard23 + Kendra Pendragon P.P. | |
Rote Tasche "Soft" mit Schlafsäcken etc. | 60 x 35 x 35 cm | Wizard23 + Kendra Pendragon P.P. | |
Dunkelgraue Kiste mit pinkem Ducktape (Fragil) | 60 x 45 x 30 cm | Wizard23 + Kendra Pendragon P.P. | |
Wacken W.O.A Stierschädel Campingsessel in Tasche | 90 x 15 x 15 cm | Wizard23 + Kendra Pendragon P.P. | |
Ikea Sackerl blau | 60 x 40 x 40 cm | Wizard23 + Kendra Pendragon P.P. | |
Schlafsack + Zelt | insg. ca60 x 35 x 35 cm | ncl | |
Tasche | ca. 60x20x20 | becca | |
Rollkoffer | ??? | ?? | piro |
Zelt | qch3n |
Feedback
List of improvements for future Camp visits that occurred to people during and after CCCamp 2023
Stromversorgung, Verkabelung
- more power cords / distribution (outdoor tauglich, Wetterfest)
- mehr drehstromkabel insbesondere
- Kabelfender - Kabel vergraben - Verkabelungsplanung vorher machen - alternativ: metasolar und dazu passende Verkabelung
Organisation
- Verantwortliche für Einzelbereiche finden (treasury, comms with upstream, pre-orders, packing lists, ...) - früh den Orga-Kanälen des Events beitreten - Vorbestellungen besser planen und schauen dass sie auch durchgeführt werden
- und irgendwo aufschreiben / bekannt machen
- Täglicher kurzer cleanup in Zelt und Dome - Tägliche Abstimmung/Plenum was wir so machen wollen (bzw jeden zweiten Tag, zB für dieses Camp, Tag -1 Sonntag Tag 1 Dienstag, Tag 3 Donnerstag, Tag 5 Samstag) - Schilder vorher planen und herstellen
Logistik
- Mehr Leute die sich auskennen beim einladen dabei haben - Mehr Regale/storage space im Zelt - Mehr Zeug in Euroboxen lagern - auch fuer Transport von Privatsachen
- weiche privatsachen packen aber besser als halbleere kisten
- packing lists with checkmark columns for 'prepared', 'functionality check ok', 'loaded', 'loaded for return', 'unloaded', 'stored' and comments checkliste von equipment, ausgedruckt und checken beim einladen - updaten vor dem camp - eine Checkliste haben anstatt 3
Nicht alle Schrauben vom Knopparp lösen / beim Abbau Leute dabei haben, die schon mal ein Knopparp zerlegt haben, Gedruckte Knopparp Bauanleitung dabei haben
Beim Umfüllen von Schrauben am Camp besser aufpassen. (Was ist beim Handling passiert? Lässt sich das vielleicht durch Decken oder Trichter lösen? Oder mehr passende, verschließbare Kisten/Boxen?)
- Ausreichend Ersatzschrauben dabei haben
Fehlendes Equipment
- Müllsäcke mitnehmen - isopropanol mitnehmen - Metalab Stempel + Stempelkissen für Pässe mitnehmen - Metalab Postkarten mitnehmen (und bei der ChaosPost auslegen) - Metalab Sticker an Tag 0/1/2 in Stickerboxen verteilen (Die ChaosPost bietet das als Service an.)
--> Allgemeine Checkliste für Camp-Stuff
Inkompatibilitäten
Nicht Workshop Space + direkt neben den Marktplatz (Marktplatz wins, Workshop sad)
Nutrition and Hydration
- Community snacks, sweets, alcohol
- früher gabs 24h breakfast: vernüftiger kühlschrank, plattengrill, jeden tag einkaufen fahren. bringt geld in die camp-kassa für anschaffungen und reparaturen, transport → Dafuer gibts jetzt die Chaos West-Kueche, wollen wir Parallelinfrastruktur stattdessen? → ja, muss man abwägen
- Wasserkocher + Ramen - Toaster + Käse? - pre-order drinks, for 7 days at least 10 crates
- Dont forget to pay the preorder things
- make sure a specific person is declared to be responsible for ordering drinks
- Maybe bring premium Cola, even Späti doesn't have it - I told you :( - Frühstück bei Chaos west machen?
Dome/Zeltsituation
noch mehr Sound-deadening ! - Ventilatoren für forced air (Dome) - Mehr abdunkelung am C3W-Zelt
Community "first aid"? (Was genau ist damit gemeint? Erste Hilfe Kasten vor Ort für Kleinstverletzungen? Pflastersize) - kleiner Erste-Hilfe Koffer (Desinfektion, Pflaster, inoffiziell Medikamente,...) --> auf die Packliste
Prepare and test phonebooth/Update phonebooth counter - SUPER WICHTIG!!!
Audio equipment necessary? Was not used due to main stage iirc - wussten wir nicht vorher und konnten es daher nicht einplanen
Packliste für generelles lab-zeug
-> Liste klärt fix!!
Das Dome-Equipment ist bis zum Ende nicht vollstaendig aufgebaut worden (vor allem die Sitze).
Feedback ans CCCamp23 kann ebenfalls abgeliefert werden:
https://events.ccc.de/camp/2023/hub/camp23/de/info/feedback/
- Marktplatz Bühne zu laut, vor allem dafuer, dass sie um 10 Uhr begonnen haben und die Party in der Nacht immer bis 4 Uhr gegangen ist.
- frühzeitig einen information-hub statt blog + mastodon + matrix + wiki + etc...
- informations-Hub auf einer Webseite, nicht irgendwo in einem service vergraben
- nur bargeld ist eine zumutung
- viel zu wenige Klos
Checklisten für das nächste Camp
Generelle Village-Stuff Packliste:
- Müllsäcke
- Papierhandtücher/Küchenrolle
- Reinigungsmittel
- Metalab Stempel + Stemplekissen
- Stickerbox
- Postkarten
- Papier
- Stifte (1+ davon fix)
- Verteilerstecker (5 * 6+ Schuko, eventuell mit USB)
- B Drehstromequipment
- Pflaster
- Blasenpflaster
- Desinfektionsmittel
- Aspirin (Rezeptfreie Medikamente)
- Sonnencreme
- Wasserkocher
- Instantramen
- Toaster
- USB-C PD Netzteile (so 6 Ports / 3 Netzteile) + Kabel
- FFP2 Masken (50+ Stück)
- Gaffer
- Malerklebeband
- Kabelbinder (lösbar)
- Handkassa für Getränke
- Beachflag
- Leiter (bei Andi Modell nachfragen)
- Leiterwagen
- Schraubendreher
- Bitset
- Hammer
- Zangen und Seitenschneider
- Handsäge
- Messer
- Seile (Reepschnur)
Dinge die im Vorfeld zu organisieren sind:
- Planung ab etwa Februar des Jahres
- Verantwortliche für Einzelbereiche finden (treasury, comms with upstream, pre-orders, packing lists, ...)
- früh den Orga-Kanälen des Events beitreten
- Vorbestellungen für Getränke/stuff planen
- Tägliche Meetings / Cleanups planen
- Schilder vorher planen und herstellen
Links
- Leiwandville
- Metasolar
- [OLD] MCH2022 at the Metalab Wiki
- [OLD] CCCamp2019 at the Metalab Wiki
- [OLD] SHA2017 at the Metalab Wiki
- [OLD] CCCamp2015 at the Metalab Wiki
- [OLD] OHM2013 at the Metalab Wiki
- [OLD] CCCamp2011 at the Metalab Wiki
- [OLD] HAR2009 at the Metalab Wiki
- [OLD] CCCamp2007 at the Metalab Wiki