Lounge

aus Metalab Wiki, dem offenen Zentrum für meta-disziplinäre Magier und technisch-kreative Enthusiasten.
Zur Navigation springenZur Suche springen

empty space, threatening void

Declassified Information (written by the machines)

The Moth War, also known as the Metalab Moth Infestation, was a conflict that occurred at the hackerspace metalab in the second half of 2022. The war was sparked by a sudden influx of moths in the lounge area, causing concern among the members of metalab.

The first line of response was led by Lt. [REDACTED] and Maj. Gen. [REDACTED], who implemented a scorched earth policy of removing and destroying all upholstered furniture in the lounge. This initial action was successful in reducing the number of moths, but it also left the lounge area barren and unusable.

In an effort to further combat the infestation, Pvt. [REDACTED] initiated a biological warfare campaign, releasing ichneumonids, predatory insects, into the lounge, and while it was initially successful in reducing the moth population, the moths quickly adapted and the campaign was ultimately fruitless.

Faced with a growing moth population, Maj. Gen. [REDACTED] decided to escalate the conflict by implementing a full-on chemical warfare campaign. Using powerful pesticides, she was able to eradicate the majority of the moths, finally bringing the war to a successful end.

The lounge area was left in a state of disarray, with many members expressing concern over the potential health and environmental effects of the chemical warfare campaign. Despite these concerns, the members of metalab were determined to rebuild the lounge, with the goal of creating a space that was even better than before.

As of now, the lounge is still in the early stages of renovation, with members working tirelessly to rebuild and improve the space. In the aftermath of the Moth War, metalab implemented stricter policies for pest control, ensuring that such an infestation would never occur again. The lounge is expected to reopen in the near future, with many members looking forward to enjoying the newly renovated space.

The Moth War serves as a cautionary tale of the potential consequences of allowing pests to go unchecked, and the importance of taking swift and decisive action in the face of such a threat.




Current State of the Lounge

ReLounge

Use Cases

  • video consumption
  • audio consumption
  • video games
  • quick in/out hopping (Spaziergang time)
  • slacking
  • laptop time
  • board games
  • jamming

Requirements

  1. accessibility
    1. door width
    2. ladder access
    3. furniture arrangement (seating / tables)
  2. cozyness
    1. furniture type
    2. lighting mood
  3. versatility
    1. light mood sellectivity
    2. audio setup connectivity
    3. table surface accesssibility
  4. grind-resistance
    1. seamless floor

Implementation

0% -> ready to start

1-99% -> in progress

✅ -> done

todo
Item known unknowns Responsible
remove garbage
move equipment out where can the equipment be stored ?
tear down electricals & network garbage management
tear down ladders & wood paneling behind them
disconnect & remove lounge radiator
remove wet (moldy?) street-side plaster
remove rubble
clean up brick dust
tear out floor
remove lower border of street-side plaster
bring floor-components and other trash to relevant mistplatz 90%
cut out old electrics as close to walls as possible
widen door ? gains/feasability/risks for accessibility improvements 10%
flatten historical floor
remove floor dust special equipment needed ?
fill up gaps under walls / wooden "cable tray" ncl
build a concrete slide to get concrete from the truck into the lounge
organize tools (Abziehlatte, 3 Shovels, kellen)
tell the Vermieter what exactly to tell them
clear the corner in the main room, palce plastic tarp, make a dirt-schleuse
cover walls with tarp to protect them from concrete splashes
Parkplatz vor dem Lab blockieren Mit MA reden, beantragen, etc.
order the concrete ripper
pour new floor ripper
replaster wall(s) ? yes / no
decide on room layout ladders / seating / eqipment
rebuild ladders ladder requirements, ladder design
rebuild electricals using Kabeltrassen requirements
rebuild networking using Kabeltrassen requirements
rebuild lighting
acquire furniture
redo lounge setup requirements


Floor

Estrichaktion 2024-03-07

Am 7. März um 15:00ish wird geestricht. Dazu brauchen wir viele leute und Werkzeug. Außerdem muss dafür einiges vorbereitet werden (siehe weiter oben). Tätigkeiten sind unter anderem:

  • Beton schaufeln
  • Beton abziehen
  • Werkzeuge handeln (Leuten in der Lounge übergeben)
  • Werkzeuge putzen
  • Mit der Betonfirma reden
  • Essen machen, Getränke
  • Wegräumen, Betonreste beseitigen
  • Standby für eventuellen Estrichnachkauf

Wer ist dabei:

Wer? Kann physische Arbeit Kommentar
ripper -
ncl brutalisme!
becca Nomnom Beton
piro ? kann Notfalls beim Schaufeln helfen, sonst kochen / zureichen / ...
Du? / Nomnom Beton
Du? / Nomnom Beton
Du? / Nomnom Beton
Du? / Nomnom Beton
Du? / Nomnom Beton
Du? / Nomnom Beton

Boden eben

der Boden sollte eben sein, und eingermassen auf gleicher Höhe wie der Boden der Bib, damit wir einen Barrierearmen Boden haben wenn wir irgendwann den Hauotraumboden neu gemacht haben...

Das Problem dabei ist, dass der historische Estrich sehr uneben und teilweise sehr knapp am niveau der Bib dran (oder sogar knapp drüber) ist.

Höchster Punkt Bib +1 cm einzelne Punkte, wegstemmen, rot markiert
Höchste Fläche Bib -2 cm
Durchschnitt Bib -3.5 cm
Niedrigster Punkt Bib -6 cm

Serviervorschlag 2

Estrichboden

Abschätzung Beton/Estrich der rein muss:

  • Grundfläche von 5,3x4,03m --> 21,36m²
  • Mittlere Dicke ca. 7cm --> 1,5m³ Beton
  • Estrichbeton von Obi hat eine Dichte von 2000kg/m³ --> 3000kg Estrich
  • --> 75 Säcke á 4€ --> 300€ für Estrich

Serviervorschlag 1

Lounge Grundfläche ca. 22 m²

Bodenauswahl bei obi

15-30 euro / m² stark beanspruchbares Laminat bei Obi -> ca 330-660 euro bodenlaminat (9mm?)

2 - 4 € /m² "laminatunterlage" bei OBI -> 44 - 88 € / 22m²

darunter spanplatten platte bei obi -> ca 374,- / 22m²

eventuell noch quertráger austauschen/erweitern

bodenaufbau historisch

querträger alle ca 50cm, ein bissl festgeestriccht

darauf schaumstoffbahnen

darauf spanplatten ca 22mm

darauf trittschutz ca 1-2mm blauer kram

darauf laminat ca 9mm

Electrics

aaaaaaaaaaah

lol.