| remove floor dust (the sooner the better)|| special equipment needed ? || ||
| remove floor dust (the sooner the better)|| special equipment needed ? || ||
|-
|-
| fill up gaps under walls / wooden "cable tray" (the sooner the better) || || [[User:Nicole|ncl]]||
| fill up gaps under walls / wooden "cable tray" (the sooner the better) || || [[User:Nicole|ncl]]||
|-
|-
| build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest )||  || [[User:ripper|ripper]] || ✅
| build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest )||  || [[User:ripper|ripper]] || ✅
Zeile 103: Zeile 103:
| clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) || || || tarp bought
| clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) || || || tarp bought
|-
|-
| cover walls with tarp to protect them from concrete splashes (the sooner the better)|| || ||  
| cover walls with tarp to protect them from concrete splashes (the sooner the better)|| || ||
|-
|-
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || piro || in progress
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || piro || in progress
|-
|-
| order the concrete || || [[User:ripper|ripper]] ||
| order the concrete || || [[User:ripper|ripper]] ||
|-
|-
| pour new floor || || [[User:ripper|ripper]] ||
| pour new floor || || [[User:ripper|ripper]] ||