Zum Inhalt springen

Lounge: Unterschied zwischen den Versionen

M3lt (Diskussion | Beiträge)
Qchen (Diskussion | Beiträge)
Zeile 91: Zeile 91:
| flatten historical floor || || || ✅
| flatten historical floor || || || ✅
|-
|-
| remove floor dust || special equipment needed ? || ||
| remove floor dust (the sooner the better)|| special equipment needed ? || ||
|-
|-
| fill up gaps under walls / wooden "cable tray" || || [[User:Nicole|ncl]]||
| fill up gaps under walls / wooden "cable tray" (the sooner the better) || || [[User:Nicole|ncl]]||
|-
|-
| build a concrete slide to get concrete from the truck into the lounge ||  || ||
| build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest )||  || ||
|-
|-
| organize tools (Abziehlatte, 3 Shovels, kellen) || || ||
| organize tools (Abziehlatte, 3 Shovels, kellen, wood sheet to walk on drying beton) || || ||
|-
|-
| tell the Vermieter || what exactly to tell them || ||
| tell the Vermieter (3 days before betondown)|| what exactly to tell them || ||
|-
|-
| clear the corner in the main room, palce plastic tarp, make a dirt-schleuse || || ||
| clear the corner in the main room, palce plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) || || ||
|-
|-
| cover walls with tarp to protect them from concrete splashes || || ||
| cover walls with tarp to protect them from concrete splashes (the sooner the better)|| || ||
|-
|-
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || ||
| Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || piro || in progress
|-
|-
| order the concrete || || [[User:ripper|ripper]] ||
| order the concrete || || [[User:ripper|ripper]] ||
Abgerufen von „https://metalab.at/wiki/Lounge