+ | == What?== | ||
+ | |||
+ | A geodesic dome (V4 design) built from slatted frames (Lattenrostbretteln) | ||
+ | |||
+ | It was built during Stadtflucht 8 in the Summer of 2015 right before the CCCamp. | ||
+ | |||
+ | The total cost was below 200,- because only recycled slatted frames were used. | ||
+ | |||
+ | Construction took about 10 hours with estimated 10 people involved. | ||
+ | |||
=== Preparation=== | === Preparation=== | ||
+ | Want to build your own? | ||
You need: | You need: | ||
Zeile 82: | Zeile 95: | ||
* MIDDLE (A) outermost layer | * MIDDLE (A) outermost layer | ||
* LEFT (B) middle layer | * LEFT (B) middle layer | ||
− | *RIGHT(B) innermost layer | + | * RIGHT(B) innermost layer |
and thats how you go on according to the diagram above. | and thats how you go on according to the diagram above. | ||
Zeile 99: | Zeile 112: | ||
| Type | | Type | ||
| Count | | Count | ||
− | | MEASUREMENTS (center | + | | MEASUREMENTS (center connector -> center connector) |
− | | MEASUREMENNTS FOR CUTOUT | + | | MEASUREMENNTS FOR CUTOUT TRIANGLES |
|- | |- | ||
| AAB | | AAB | ||
Zeile 136: | Zeile 149: | ||
=== TODO=== | === TODO=== | ||
− | * measure the sizes of the different triangles / create different inlays with | + | * measure the sizes of the different triangles / create different inlays with mirrors and out of acrylic |
*<s> measure the top / center pentagon for replacement with solid wood </s> '''done''' | *<s> measure the top / center pentagon for replacement with solid wood </s> '''done''' | ||
*<s> add sprinklers for water</s> '''done''' | *<s> add sprinklers for water</s> '''done''' | ||
*<s> add ventilator </s> '''done''' | *<s> add ventilator </s> '''done''' | ||
* <s> design ledmounts</s> '''done''' [http://www.thingiverse.com/thing:941476 thingiverse] | * <s> design ledmounts</s> '''done''' [http://www.thingiverse.com/thing:941476 thingiverse] | ||
+ | * <s>3d-print ledmounts</s> '''done''' | ||
* add 75 leds | * add 75 leds | ||
− | |||
[[Kategorie:Howto]] | [[Kategorie:Howto]] | ||
[[Kategorie:Projekte]] | [[Kategorie:Projekte]] |
Version vom 29. Juli 2015, 17:32 Uhr
MIDDLE - LEFT - RIGHT (what a nice mantra)
What?
A geodesic dome (V4 design) built from slatted frames (Lattenrostbretteln)
It was built during Stadtflucht 8 in the Summer of 2015 right before the CCCamp.
The total cost was below 200,- because only recycled slatted frames were used.
Construction took about 10 hours with estimated 10 people involved.
Preparation
Want to build your own? You need:
- 250 bars (get 270+ to have some spareparts) the inner parts of slatted frames for beds work great
- 91 M6 screws (length: 80 mm)
- 91 Wing nuts
- 182 Washers (the bigger the better)
- Spray paint (RED,GREEN,BLUE,ORANGE)
Cut them in 5 different lengths.
Type | Color | Pcs. | Length |
A | ORANGE | 30 | 60cm |
B | RAINBOW | 90 | 70cm |
D | GREEN | 70 | 74.2cm |
E | BLUE | 30 | 77cm |
F | RED | 30 | 70.8cm |
Drill a hole 2cm from the border in the middle of the struts ends.
Assembly
Start with 5 pcs type A struts (orange) Connect them like this: WASHER, SCREW, 5 BARS (A),WASHER,WING NUT, dont over tighten yet
You successfully put together the middle structure that will be on the center top of the dome.
Now from the end of these connect 5 type B struts. The magic formular is:
MIDDLE - LEFT - RIGHT
- MIDDLE (A) outermost layer
- LEFT (B) middle layer
- RIGHT(B) innermost layer
and thats how you go on according to the diagram above.
This is true for the whole assembly.
Take a corner of a triangle, consider that "middle" and connect first left and then right to it.
Notes
There are 5 types of triangles:
Type | Count | MEASUREMENTS (center connector -> center connector) | MEASUREMENNTS FOR CUTOUT TRIANGLES |
AAB | 35 | 60x60x70 | 52x52x62 |
BBB | 35 | 70x70x70 | 62x62x62 |
BDF | 65 | 70 x 74.2 x 70.8 | 61 x 66 x 63 |
DDE | 25 | 74.2 x 74.2 x 77 | 66 x 66 x 69 |
EEE | 5 | 77 x 77 x 77 | 69 x 69 x 69 |
Links
DOMERAMA online dome calculator
TODO
- measure the sizes of the different triangles / create different inlays with mirrors and out of acrylic
measure the top / center pentagon for replacement with solid wooddoneadd sprinklers for waterdoneadd ventilatordonedesign ledmountsdone thingiverse3d-print ledmountsdone- add 75 leds