Lounge: Unterschied zwischen den Versionen
Nicole (Diskussion | Beiträge) |
Ripper (Diskussion | Beiträge) (Diagramme sind gut!) |
||
(55 dazwischenliegende Versionen von 12 Benutzern werden nicht angezeigt) | |||
Zeile 51: | Zeile 51: | ||
== Implementation == | == Implementation == | ||
+ | |||
+ | 0% -> ready to start | ||
+ | |||
+ | 1-99% -> in progress | ||
+ | |||
+ | ✅ -> done | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ todo | |+ todo | ||
|- | |- | ||
− | ! Item !! known unknowns !! | + | ! Item !! known unknowns !! Responsible !! ✅ |
|- | |- | ||
| remove garbage || || || ✅ | | remove garbage || || || ✅ | ||
Zeile 61: | Zeile 67: | ||
| move equipment out || where can the equipment be stored ? || || ✅ | | move equipment out || where can the equipment be stored ? || || ✅ | ||
|- | |- | ||
− | | tear down electricals & network || garbage management || | + | | tear down electricals & network || garbage management || || ✅ |
|- | |- | ||
| tear down ladders & wood paneling behind them || || || ✅ | | tear down ladders & wood paneling behind them || || || ✅ | ||
Zeile 71: | Zeile 77: | ||
| remove rubble || || || ✅ | | remove rubble || || || ✅ | ||
|- | |- | ||
− | | tear out floor || || || | + | | clean up brick dust || || || ✅ |
+ | |- | ||
+ | | tear out floor || || || ✅ | ||
+ | |- | ||
+ | | remove lower border of street-side plaster || || || ✅ | ||
+ | |- | ||
+ | | bring floor-components and other trash to relevant mistplatz || || || ✅ | ||
+ | |- | ||
+ | | cut out old electrics as close to walls as possible || || || ✅ | ||
+ | |- | ||
+ | | widen door || gains/feasability/risks for accessibility improvements || [[User:ripper|ripper]] || 10% | ||
+ | |- | ||
+ | | flatten historical floor || || || ✅ | ||
+ | |- | ||
+ | | remove floor dust (the sooner the better)|| special equipment needed ? || || ✅ | ||
|- | |- | ||
− | | | + | | fill up gaps under walls / wooden "cable tray" (the sooner the better) || || [[User:Nicole|ncl]]|| ✅ |
|- | |- | ||
− | | | + | | build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest )|| || [[User:ripper|ripper]] || ✅ |
|- | |- | ||
− | | | + | | organize tools (Abziehlatte, 3 Shovels, kellen, wood sheet to walk on drying beton) || || [[User:ripper|ripper]] || ✅ |
+ | |- | ||
+ | | clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) || || || ✅ | ||
+ | |- | ||
+ | | cover walls with tarp to protect them from concrete splashes (the sooner the better)|| || || ✅ | ||
+ | |- | ||
+ | | Parkplatz vor dem Lab blockieren || Mit MA reden, beantragen, etc. || piro || ✅ | ||
+ | |- | ||
+ | | order the concrete || || [[User:ripper|ripper]] || ✅ | ||
+ | |- | ||
+ | | pour new floor || || [[User:ripper|ripper]] || ✅ | ||
+ | |- | ||
+ | | Fill holes in new floor || Use some Nivelliermasse || ncl, lasi, ... (you?), thx to ripper for explanation || ✅ | ||
+ | |- | ||
+ | | Flatten/grind down high spots on new floor || rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961 || || | ||
|- | |- | ||
| replaster wall(s) ? || yes / no || || | | replaster wall(s) ? || yes / no || || | ||
+ | |- | ||
+ | | paint walls || || || | ||
+ | |- | ||
+ | | lay new floor || Which floor (Laminat/PVC/Epoxy??) || || | ||
|- | |- | ||
| decide on room layout || ladders / seating / eqipment || || | | decide on room layout || ladders / seating / eqipment || || | ||
Zeile 89: | Zeile 127: | ||
| rebuild networking using Kabeltrassen || requirements || || | | rebuild networking using Kabeltrassen || requirements || || | ||
|- | |- | ||
− | | rebuild lighting || || | + | | rebuild lighting || || || |
|- | |- | ||
| acquire furniture || || || | | acquire furniture || || || | ||
Zeile 98: | Zeile 136: | ||
=== Floor === | === Floor === | ||
− | ==== Serviervorschlag ==== | + | ==== Estrichaktion 2024-03-07 ==== |
+ | tnx an [[User:ripper|ripper]], [[User:Nicole|ncl]], [[User:M3lt|Felix]], [[User:becca|becca]], piro, [[User:amalia|amalia]], [[User:neuron|neuron]] und alle anderen die dabei geholfen haben | ||
+ | |||
+ | ==== Auffüllen&Schleifen ==== | ||
+ | Der Boden ist sooo schief (Daten aus [[Datei:Lounge.xlsx]]):<br> | ||
+ | {| | ||
+ | ! Vor Schleifen !! nach Schleifen | ||
+ | |- | ||
+ | | [[Datei:Loungeboden_warped_1.png|500px]] || [[Datei:Loungeboden_less_warped_1.png|500px]] | ||
+ | |- | ||
+ | | [[Datei:Loungeboden_warped_2.png|500px]] || [[Datei:Loungeboden_less_warped_2.png|500px]] | ||
+ | |} | ||
+ | |||
+ | Daher: | ||
+ | # Löcher mit Ausgleichsmasse/Nivellierspachtel auffüllen (wurde am 22.05.2024 erledigt) | ||
+ | # Boden Schleifen | ||
+ | |||
+ | Mit etwas Glück sollte der Boden nicht mehr als 1 bis 1,5cm schief von der Tür bis zur Galaxiwand sein. Und dabei gerade von Rathausstraße zum Blinkentunnel sein. | ||
+ | |||
+ | ==== Boden Fräsen Freitag 11.-Montag 14. Oktober 2024 ==== | ||
+ | |||
+ | Wir müssen [https://www.boels.com/de-at/mieten/bodenfraese-230-v/p/10961 eine Fräse] ausborgen, ins Metalab bringen, fräsen und das Gerät zurück bringen. | ||
+ | * Fräse Reserviert (done) | ||
+ | * Abholung Freitag ab 14:00 - 17:00 (offen) | ||
+ | * Schleifen am Samstag (und/oder Sonntag?) - offen | ||
+ | * Zurückbringen am Montag vor 8:00 (offnet um 7:00) (offen) | ||
+ | |||
+ | '''Den Orga Hut trägt [[Benutzer:Sonstwer|Sonstwer]]''' | ||
+ | |||
+ | =====Wer ist dabei===== | ||
+ | Freitag: | ||
+ | Es braucht 1 Auto, eine Person mit Führerschein und Personen, die beim Ein- und Ausladen zu helfen | ||
+ | |||
+ | * [[User:lasii|lasii]] - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien | ||
+ | * Dein Name - Deine Mithilfmöglichkeit | ||
+ | |||
+ | Samstag: | ||
+ | Es braucht mindestens ca 4 Personen, die mithelfen das Gerät zu bedienen | ||
+ | |||
+ | * [[User:emnichtda|Zoe]] | ||
+ | * [[User:Sonstwer|Sonstwer]] | ||
+ | * Dein Name | ||
+ | * Dein Name | ||
+ | * Dein Name | ||
+ | |||
+ | Sonntag: | ||
+ | Wir hoffen am Samstag schon fertig zu werden, aber falls nicht: | ||
+ | |||
+ | * [[User:emnichtda|Zoe]] | ||
+ | * [[User:Sonstwer|Sonstwer]] | ||
+ | * Dein Name | ||
+ | * Dein Name | ||
+ | * Dein Name | ||
+ | |||
+ | Auch braucht es Hilfe beim Rückverladen in ein Transportfahrzeug | ||
+ | |||
+ | Montag: | ||
+ | |||
+ | Wir brauchen eine*n Held*in, der/die das Gerät bis 8 Uhr früh zurück bringen kann (frühestens 7 Uhr) | ||
+ | |||
+ | * [[User:lasii|lasii]] - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien | ||
+ | * Dein Name | ||
+ | |||
+ | Adresse: Boels Maschinenverleih Österreich GmbH Wien - Brunn am Gebirge | ||
+ | |||
+ | Johann-Steinbock-Str. 14 | ||
+ | 2345 Brunn am Gebirge | ||
+ | Tel +43 (0)2236-312460 | ||
+ | Depot.327@boels.at | ||
+ | |||
+ | Auftragsnummer: 3270124114 | ||
+ | |||
+ | ==== Boden eben ==== | ||
+ | der Boden sollte eben sein, und eingermassen auf gleicher Höhe wie der Boden der Bib, | ||
+ | damit wir einen Barrierearmen Boden haben wenn wir irgendwann den Hauotraumboden neu gemacht haben... | ||
+ | |||
+ | Das Problem dabei ist, dass der historische Estrich sehr uneben und teilweise sehr knapp am niveau der Bib dran (oder sogar knapp drüber) ist. | ||
+ | |||
+ | {| class="wikitable" | ||
+ | | Höchster Punkt || Bib +1 cm || einzelne Punkte, wegstemmen, rot markiert | ||
+ | |- | ||
+ | | Höchste Fläche || Bib -2 cm | ||
+ | |- | ||
+ | | Durchschnitt || Bib -3.5 cm | ||
+ | |- | ||
+ | | Niedrigster Punkt || Bib -6 cm | ||
+ | |} | ||
+ | |||
+ | ==== Serviervorschlag 2 ==== | ||
+ | |||
+ | Estrichboden | ||
+ | |||
+ | Abschätzung Beton/Estrich der rein muss: | ||
+ | * Grundfläche von 5,3x4,03m --> 21,36m² | ||
+ | * Mittlere Dicke ca. 7cm --> 1,5m³ Beton | ||
+ | * [https://www.obi.at/trockenmoertel/estrich-und-fuellbeton-40-kg/p/2617702 Estrichbeton von Obi] hat eine Dichte von 2000kg/m³ --> 3000kg Estrich | ||
+ | * --> 75 Säcke á 4€ --> 300€ für Estrich | ||
+ | |||
+ | ==== Serviervorschlag 1 ==== | ||
Lounge Grundfläche ca. 22 m² | Lounge Grundfläche ca. 22 m² | ||
Zeile 114: | Zeile 250: | ||
==== bodenaufbau historisch ==== | ==== bodenaufbau historisch ==== | ||
− | querträger alle ca 50cm | + | querträger alle ca 50cm, ein bissl festgeestriccht |
+ | |||
+ | darauf schaumstoffbahnen | ||
darauf spanplatten ca 22mm | darauf spanplatten ca 22mm |
Aktuelle Version vom 20. November 2024, 19:36 Uhr
empty space, threatening void
Declassified Information (written by the machines)
The Moth War, also known as the Metalab Moth Infestation, was a conflict that occurred at the hackerspace metalab in the second half of 2022. The war was sparked by a sudden influx of moths in the lounge area, causing concern among the members of metalab.
The first line of response was led by Lt. [REDACTED] and Maj. Gen. [REDACTED], who implemented a scorched earth policy of removing and destroying all upholstered furniture in the lounge. This initial action was successful in reducing the number of moths, but it also left the lounge area barren and unusable.
In an effort to further combat the infestation, Pvt. [REDACTED] initiated a biological warfare campaign, releasing ichneumonids, predatory insects, into the lounge, and while it was initially successful in reducing the moth population, the moths quickly adapted and the campaign was ultimately fruitless.
Faced with a growing moth population, Maj. Gen. [REDACTED] decided to escalate the conflict by implementing a full-on chemical warfare campaign. Using powerful pesticides, she was able to eradicate the majority of the moths, finally bringing the war to a successful end.
The lounge area was left in a state of disarray, with many members expressing concern over the potential health and environmental effects of the chemical warfare campaign. Despite these concerns, the members of metalab were determined to rebuild the lounge, with the goal of creating a space that was even better than before.
As of now, the lounge is still in the early stages of renovation, with members working tirelessly to rebuild and improve the space. In the aftermath of the Moth War, metalab implemented stricter policies for pest control, ensuring that such an infestation would never occur again. The lounge is expected to reopen in the near future, with many members looking forward to enjoying the newly renovated space.
The Moth War serves as a cautionary tale of the potential consequences of allowing pests to go unchecked, and the importance of taking swift and decisive action in the face of such a threat.
ReLounge
Use Cases
- video consumption
- audio consumption
- video games
- quick in/out hopping (Spaziergang time)
- slacking
- laptop time
- board games
- jamming
Requirements
- accessibility
- door width
- ladder access
- furniture arrangement (seating / tables)
- cozyness
- furniture type
- lighting mood
- versatility
- light mood sellectivity
- audio setup connectivity
- table surface accesssibility
- grind-resistance
- seamless floor
Implementation
0% -> ready to start
1-99% -> in progress
✅ -> done
Item | known unknowns | Responsible | ✅ |
---|---|---|---|
remove garbage | ✅ | ||
move equipment out | where can the equipment be stored ? | ✅ | |
tear down electricals & network | garbage management | ✅ | |
tear down ladders & wood paneling behind them | ✅ | ||
disconnect & remove lounge radiator | ✅ | ||
remove wet (moldy?) street-side plaster | ✅ | ||
remove rubble | ✅ | ||
clean up brick dust | ✅ | ||
tear out floor | ✅ | ||
remove lower border of street-side plaster | ✅ | ||
bring floor-components and other trash to relevant mistplatz | ✅ | ||
cut out old electrics as close to walls as possible | ✅ | ||
widen door | gains/feasability/risks for accessibility improvements | ripper | 10% |
flatten historical floor | ✅ | ||
remove floor dust (the sooner the better) | special equipment needed ? | ✅ | |
fill up gaps under walls / wooden "cable tray" (the sooner the better) | ncl | ✅ | |
build a concrete slide to get concrete from the truck into the lounge (needs a few wood sheets, 1-2 days before betondown at the latest ) | ripper | ✅ | |
organize tools (Abziehlatte, 3 Shovels, kellen, wood sheet to walk on drying beton) | ripper | ✅ | |
clear the corner in the main room, place plastic tarp, make a dirt-schleuse (1-2 days before betondown at the latest) | ✅ | ||
cover walls with tarp to protect them from concrete splashes (the sooner the better) | ✅ | ||
Parkplatz vor dem Lab blockieren | Mit MA reden, beantragen, etc. | piro | ✅ |
order the concrete | ripper | ✅ | |
pour new floor | ripper | ✅ | |
Fill holes in new floor | Use some Nivelliermasse | ncl, lasi, ... (you?), thx to ripper for explanation | ✅ |
Flatten/grind down high spots on new floor | rent a Betonfräse? https://www.boels.com/de-de/mieten/bodenfraese-230-v/p/10961 | ||
replaster wall(s) ? | yes / no | ||
paint walls | |||
lay new floor | Which floor (Laminat/PVC/Epoxy??) | ||
decide on room layout | ladders / seating / eqipment | ||
rebuild ladders | ladder requirements, ladder design | ||
rebuild electricals using Kabeltrassen | requirements | ||
rebuild networking using Kabeltrassen | requirements | ||
rebuild lighting | |||
acquire furniture | |||
redo lounge setup | requirements |
Floor
Estrichaktion 2024-03-07
tnx an ripper, ncl, Felix, becca, piro, amalia, neuron und alle anderen die dabei geholfen haben
Auffüllen&Schleifen
Der Boden ist sooo schief (Daten aus Datei:Lounge.xlsx):
Vor Schleifen | nach Schleifen |
---|---|
Daher:
- Löcher mit Ausgleichsmasse/Nivellierspachtel auffüllen (wurde am 22.05.2024 erledigt)
- Boden Schleifen
Mit etwas Glück sollte der Boden nicht mehr als 1 bis 1,5cm schief von der Tür bis zur Galaxiwand sein. Und dabei gerade von Rathausstraße zum Blinkentunnel sein.
Boden Fräsen Freitag 11.-Montag 14. Oktober 2024
Wir müssen eine Fräse ausborgen, ins Metalab bringen, fräsen und das Gerät zurück bringen.
- Fräse Reserviert (done)
- Abholung Freitag ab 14:00 - 17:00 (offen)
- Schleifen am Samstag (und/oder Sonntag?) - offen
- Zurückbringen am Montag vor 8:00 (offnet um 7:00) (offen)
Den Orga Hut trägt Sonstwer
Wer ist dabei
Freitag: Es braucht 1 Auto, eine Person mit Führerschein und Personen, die beim Ein- und Ausladen zu helfen
- lasii - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
- Dein Name - Deine Mithilfmöglichkeit
Samstag: Es braucht mindestens ca 4 Personen, die mithelfen das Gerät zu bedienen
Sonntag: Wir hoffen am Samstag schon fertig zu werden, aber falls nicht:
Auch braucht es Hilfe beim Rückverladen in ein Transportfahrzeug
Montag:
Wir brauchen eine*n Held*in, der/die das Gerät bis 8 Uhr früh zurück bringen kann (frühestens 7 Uhr)
- lasii - besitzt Führerschein und möglicherweise hab ich ein Fahrzeug zu dem Zeitpunkt in Wien
- Dein Name
Adresse: Boels Maschinenverleih Österreich GmbH Wien - Brunn am Gebirge
Johann-Steinbock-Str. 14 2345 Brunn am Gebirge Tel +43 (0)2236-312460 Depot.327@boels.at
Auftragsnummer: 3270124114
Boden eben
der Boden sollte eben sein, und eingermassen auf gleicher Höhe wie der Boden der Bib, damit wir einen Barrierearmen Boden haben wenn wir irgendwann den Hauotraumboden neu gemacht haben...
Das Problem dabei ist, dass der historische Estrich sehr uneben und teilweise sehr knapp am niveau der Bib dran (oder sogar knapp drüber) ist.
Höchster Punkt | Bib +1 cm | einzelne Punkte, wegstemmen, rot markiert |
Höchste Fläche | Bib -2 cm | |
Durchschnitt | Bib -3.5 cm | |
Niedrigster Punkt | Bib -6 cm |
Serviervorschlag 2
Estrichboden
Abschätzung Beton/Estrich der rein muss:
- Grundfläche von 5,3x4,03m --> 21,36m²
- Mittlere Dicke ca. 7cm --> 1,5m³ Beton
- Estrichbeton von Obi hat eine Dichte von 2000kg/m³ --> 3000kg Estrich
- --> 75 Säcke á 4€ --> 300€ für Estrich
Serviervorschlag 1
Lounge Grundfläche ca. 22 m²
15-30 euro / m² stark beanspruchbares Laminat bei Obi -> ca 330-660 euro bodenlaminat (9mm?)
2 - 4 € /m² "laminatunterlage" bei OBI -> 44 - 88 € / 22m²
darunter spanplatten platte bei obi -> ca 374,- / 22m²
eventuell noch quertráger austauschen/erweitern
bodenaufbau historisch
querträger alle ca 50cm, ein bissl festgeestriccht
darauf schaumstoffbahnen
darauf spanplatten ca 22mm
darauf trittschutz ca 1-2mm blauer kram
darauf laminat ca 9mm
Electrics
lol.