Zum Inhalt springen

WhateverLab/Umbau: Unterschied zwischen den Versionen

MariusKintel (Diskussion | Beiträge)
Fin (Diskussion | Beiträge)
 
(18 dazwischenliegende Versionen von 2 Benutzern werden nicht angezeigt)
Zeile 49: Zeile 49:
=== Electricity ===
=== Electricity ===


Ideally, we should subdivide the lab into at least 3 indepentant
The WEL will be subdivided into 2 independent circuits wired from the fuse cabinet in the corner, one will serve power for the heavy machinery lab, and one for the remaining power and lights.
circuits. The main reason for this is that short circuits are more
likely to happen in an electronics lab than anywhere else. In
addition, the future machine room will draw a lot of power, so it
should have a dedicated circuit.


We might be able to reuse some cable canals inside the walls. If not,
All wiring will be done "aufputz", since the quality of the wiring inside the walls are questionable.
we'll wire the circuits externally.


A generous amount of outlets has to be provided for the work places
Lighting should be neutral and bright and without too much flickering (e.g. neon with EVG).
due to the amount of electronic apparatus being used.
 
Lighting should be neutral and bright.


== Phase 1 Tasks ==
== Phase 1 Tasks ==
Zeile 88: Zeile 80:
  |-
  |-
  |Final touch
  |Final touch
| 100%
  |  
  |  
| Some spots in the ceiling could be better covered
|}
|}


Zeile 117: Zeile 109:
  |-
  |-
  |Sand down the floor to make it even
  |Sand down the floor to make it even
  |  
  |100%
  |
  |Hopefully it's even enough now..
  |-
  |-
  |Apply coating
  |Apply coating
  |  
  | 100%
  |
  |
  |-
  |-
  |Final touch
  |Final touch
  |  
  | 100%
  |
  | Ready to rumble!
|}
|}


Zeile 138: Zeile 130:
  |-
  |-
  |Evaluate the state of the current wiring
  |Evaluate the state of the current wiring
  |  
  |100%
  |
  |Existing in-wall wires should be cut off and forgotten about
  |-
  |-
  |Decide on technical solution wrt. circuits, fuses, earth leakage breaker etc.
  |Decide on technical solution wrt. circuits, fuses, earth leakage breaker etc.
  |  
  |100%
  |
  |We have 3 x 16A + a FI dedicated to the WEL already in place
  |-
  |-
  |Decide on lighting solution
  |Decide on light & power solution
  |  
  |100%
  |
  |
  |-
  |-
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |  
  |100%
  |
  |([http://www.orion.co.at/de/docs/stores/at/w1070.htm source for library/WEL lamps])
  |-
  |-
  |Build
  |Build
  |  
  |100%
  |
  |
  |-
  |-
  |Final touch
  |Final touch
  |  
  | 100%
  |
  |
|}
|}


= Plans & Ideas for Further Phases =
= Further Phases =
 
FIXME
 
 


* Make heavy machinery lab closable to limit dust -> done (new room)
* More outlets in the remaining corners of the lab -> partially done
* Permanent network cabling -> done
* More (and orderly) shelving
* Fixed and labeled positions for oszis, soldering stations, etc
* Stairs to the big window (since Hvy Mchnry exit will be unusable for a while)






[[Kategorie:Räume]] [[Kategorie:WhateverLab]]
[[Kategorie:Räume]] [[Kategorie:WhateverLab]]