Lounge: Unterschied zwischen den Versionen

aus Metalab Wiki, dem offenen Zentrum für meta-disziplinäre Magier und technisch-kreative Enthusiasten.
Zur Navigation springenZur Suche springen
 
(2 dazwischenliegende Versionen von 2 Benutzern werden nicht angezeigt)
Zeile 79: Zeile 79:
| clean up brick dust || || ✅
| clean up brick dust || || ✅
|-
|-
| tear out floor || || 90%
| tear out floor || ||
|-
|-
| remove lower border of street-side plaster || || 0%
| remove lower border of street-side plaster || || 80%
|-
|-
| bring floor-components and other trash to relevant mistplatz || || 0%
| bring floor-components and other trash to relevant mistplatz || || 90%
|-
|-
| cut out old electrics as close to walls as possible || || 0%
| cut out old electrics as close to walls as possible || || 70%
|-
|-
| widen door ? || gains/feasability/risks for accessibility improvements ||
| widen door ? || gains/feasability/risks for accessibility improvements || 0%
|-
|-
| rebuild floor || what kind of floor ? how ? ||
| rebuild floor || what kind of floor ? how ? ||

Aktuelle Version vom 26. Oktober 2023, 18:47 Uhr

empty space, threatening void

Declassified Information (written by the machines)

The Moth War, also known as the Metalab Moth Infestation, was a conflict that occurred at the hackerspace metalab in the second half of 2022. The war was sparked by a sudden influx of moths in the lounge area, causing concern among the members of metalab.

The first line of response was led by Lt. [REDACTED] and Maj. Gen. [REDACTED], who implemented a scorched earth policy of removing and destroying all upholstered furniture in the lounge. This initial action was successful in reducing the number of moths, but it also left the lounge area barren and unusable.

In an effort to further combat the infestation, Pvt. [REDACTED] initiated a biological warfare campaign, releasing ichneumonids, predatory insects, into the lounge, and while it was initially successful in reducing the moth population, the moths quickly adapted and the campaign was ultimately fruitless.

Faced with a growing moth population, Maj. Gen. [REDACTED] decided to escalate the conflict by implementing a full-on chemical warfare campaign. Using powerful pesticides, she was able to eradicate the majority of the moths, finally bringing the war to a successful end.

The lounge area was left in a state of disarray, with many members expressing concern over the potential health and environmental effects of the chemical warfare campaign. Despite these concerns, the members of metalab were determined to rebuild the lounge, with the goal of creating a space that was even better than before.

As of now, the lounge is still in the early stages of renovation, with members working tirelessly to rebuild and improve the space. In the aftermath of the Moth War, metalab implemented stricter policies for pest control, ensuring that such an infestation would never occur again. The lounge is expected to reopen in the near future, with many members looking forward to enjoying the newly renovated space.

The Moth War serves as a cautionary tale of the potential consequences of allowing pests to go unchecked, and the importance of taking swift and decisive action in the face of such a threat.




Current State of the Lounge

ReLounge

Use Cases

  • video consumption
  • audio consumption
  • video games
  • quick in/out hopping (Spaziergang time)
  • slacking
  • laptop time
  • board games
  • jamming

Requirements

  1. accessibility
    1. door width
    2. ladder access
    3. furniture arrangement (seating / tables)
  2. cozyness
    1. furniture type
    2. lighting mood
  3. versatility
    1. light mood sellectivity
    2. audio setup connectivity
    3. table surface accesssibility
  4. grind-resistance
    1. seamless floor

Implementation

0% -> ready to start

1-99% -> in progress

✅ -> done

todo
Item known unknowns
remove garbage
move equipment out where can the equipment be stored ?
tear down electricals & network garbage management
tear down ladders & wood paneling behind them
disconnect & remove lounge radiator
remove wet (moldy?) street-side plaster
remove rubble
clean up brick dust
tear out floor
remove lower border of street-side plaster 80%
bring floor-components and other trash to relevant mistplatz 90%
cut out old electrics as close to walls as possible 70%
widen door ? gains/feasability/risks for accessibility improvements 0%
rebuild floor what kind of floor ? how ?
replaster wall(s) ? yes / no
decide on room layout ladders / seating / eqipment
rebuild ladders ladder requirements, ladder design
rebuild electricals using Kabeltrassen requirements
rebuild networking using Kabeltrassen requirements
rebuild lighting
acquire furniture
redo lounge setup requirements


Floor

Serviervorschlag

Lounge Grundfläche ca. 22 m²

Bodenauswahl bei obi

15-30 euro / m² stark beanspruchbares Laminat bei Obi -> ca 330-660 euro bodenlaminat (9mm?)

2 - 4 € /m² "laminatunterlage" bei OBI -> 44 - 88 € / 22m²

darunter spanplatten platte bei obi -> ca 374,- / 22m²

eventuell noch quertráger austauschen/erweitern

bodenaufbau historisch

querträger alle ca 50cm, ein bissl festgeestriccht

darauf schaumstoffbahnen

darauf spanplatten ca 22mm

darauf trittschutz ca 1-2mm blauer kram

darauf laminat ca 9mm

Electrics

aaaaaaaaaaah

lol.