Dome: Unterschied zwischen den Versionen

aus Metalab Wiki, dem offenen Zentrum für meta-disziplinäre Magier und technisch-kreative Enthusiasten.
Zur Navigation springenZur Suche springen
Zeile 147: Zeile 147:
[http://stadtflucht.soup.io/ Many pix in soup]
[http://stadtflucht.soup.io/ Many pix in soup]


http://www.dometheory.com/domes-as-coordinate-systems/
[http://www.dometheory.com/domes-as-coordinate-systems/]
 


=== TODO===
=== TODO===

Version vom 15. August 2015, 22:15 Uhr

MIDDLE - LEFT - RIGHT (what a nice mantra)

the overview
Cut and drill.. 500 holes
Spraypaint
Some finished struts
Painting done
Construction
Done!
Cosy
Deconstruction (~10 minute with 5 guys)


What?

A geodesic dome (V4 design) built from slatted frames (Lattenrostbretteln)

It was built during Stadtflucht 8 in the Summer of 2015 right before the CCCamp.

The total cost was below 200,- because only recycled slatted frames were used.

Construction took about 10 hours with estimated 10 people involved.


Preparation

Want to build your own? You need:

  • 250 bars (get 270+ to have some spareparts) the inner parts of slatted frames for beds work great
  • 91 M6 screws (length: 80 mm)
  • 91 Wing nuts
  • 182 Washers (the bigger the better)
  • Spray paint (RED,GREEN,BLUE,ORANGE)


Cut them in 5 different lengths.

Type Color Pcs. Length
A ORANGE 30 60cm
B RAINBOW 90 70cm
D GREEN 70 74.2cm
E BLUE 30 77cm
F RED 30 70.8cm

Drill a hole 2cm from the border in the middle of the struts ends.



Assembly

Start with 5 pcs type A struts (orange) Connect them like this: WASHER, SCREW, 5 BARS (A),WASHER,WING NUT, dont over tighten yet

You successfully put together the middle structure that will be on the center top of the dome.

Now from the end of these connect 5 type B struts. The magic formular is:


MIDDLE - LEFT - RIGHT


  • MIDDLE (A) outermost layer
  • LEFT (B) middle layer
  • RIGHT(B) innermost layer

and thats how you go on according to the diagram above.


This is true for the whole assembly.

Take a corner of a triangle, consider that "middle" and connect first left and then right to it.



Notes

There are 5 types of triangles:

Type Count MEASUREMENTS (center connector -> center connector) MEASUREMENNTS FOR CUTOUT TRIANGLES
AAB 35 60x60x70 52x52x62
BBB 35 70x70x70 62x62x62
BDF 65 70 x 74.2 x 70.8 61 x 66 x 63
DDE 25 74.2 x 74.2 x 77 66 x 66 x 69
EEE 5 77 x 77 x 77 69 x 69 x 69

Links

DOMERAMA online dome calculator

Many pix in soup

[1]

TODO

  • measure the sizes of the different triangles / create different inlays with mirrors and out of acrylic
  • measure the top / center pentagon for replacement with solid wood done
  • add sprinklers for water done
  • add ventilator done
  • design ledmounts done thingiverse
  • 3d-print ledmounts done
  • add 75 leds