Costs:
Costs:


We already have most of the equiment and material necessary, so only minor supplements are needed.
We already have most of the equiment and material necessary, so only minor supplements are needed (Putz, Tiefengund, Spachtelmasse, misc. tools)
 
* Putz, Tiefengund and Spachtelmasse: FIXME
* Misc. tools: FIXME


=== Floor ===
=== Floor ===
Zeile 48: Zeile 45:
: 4 verschiedene Farben lagernd ([[User:Philip|Philip]]: ''"wenig sexy"''), Lieferzeit anderer Farben (zB. Weiss) max. 14 Tage. eventuell bissl Flitte^W Feenstaub einstreuen
: 4 verschiedene Farben lagernd ([[User:Philip|Philip]]: ''"wenig sexy"''), Lieferzeit anderer Farben (zB. Weiss) max. 14 Tage. eventuell bissl Flitte^W Feenstaub einstreuen


 
Misc costs: Parkett Fugendicht, Montageschaum, ca. 50 euro
<s>If anyone have experience or knowledge of floor coating, please get in touch with [[User:MariusKintel]].
 
Cost estimate for an epoxy-based solution:
 
* Epoxyharz: ca. 50kg @ EUR 9 -> EUR 450
* Epoxyhärter: ca. 25kg @ EUR 13.6 -> EUR 340
* Glasfasermatte 300 gr/sqm: 40sqm @ EUR 2.80 -> EUR 112
* Misc. equiment: ca. EUR 50
 
Two color solutions (separately colored floor with see-through epoxy or single-colored epoxy):
 
* Kunstharzlack: 42 sqm @ ca. EUR 3.5/sqm -> EUR 147
* Colored epoxy: 5-10% color-to-epoxy @ 20-40 EUR/kg -> EUR 50-200
 
<b>Sum: Between EUR 1000 and EUR 1150.</b></s>


=== Electricity ===
=== Electricity ===


Ideally, we should subdivide the lab into at least 3 indepentant
The WEL will be subdivided into 2 independent circuits wired from the fuse cabinet in the corner, one will serve power for the heavy machinery lab, and one for the remaining power and lights.
circuits. The main reason for this is that short circuits are more
likely to happen in an electronics lab than anywhere else. In
addition, the future machine room will draw a lot of power, so it
should have a dedicated circuit.


We might be able to reuse some cable canals inside the walls. If not,
All wiring will be done "aufputz", since the quality of the wiring inside the walls are questionable.
we'll wire the circuits externally.


A generous amount of outlets has to be provided for the work places
Lighting should be neutral and bright and without too much flickering (e.g. neon with EVG).
due to the amount of electronic apparatus being used.
 
Lighting should be neutral and bright.


== Phase 1 Tasks ==
== Phase 1 Tasks ==
Zeile 102: Zeile 76:
  |-
  |-
  |Paint all walls and ceiling
  |Paint all walls and ceiling
  | 80%
  | 100%
  |
  |  
  |-
  |-
  |Final touch
  |Final touch
| 100%
  |  
  |  
|
|}
|}


Zeile 123: Zeile 97:
  |-
  |-
  |Build the missing piece just after the doorstep
  |Build the missing piece just after the doorstep
| 100%
|
|-
|Strengthen weak spots in the floor
  | 100%
  | 100%
  |
  |
  |-
  |-
  |Fill all cracks and edges
  |Fill all cracks and edges
  | 20%
  | 100%
  | Using foam for the edges
  |  
  |-
  |-
  |Sand down the floor to make it even
  |Sand down the floor to make it even
  |  
  |100%
  |
  |Hopefully it's even enough now..
  |-
  |-
  |Apply coating
  |Apply coating
  |  
  | 100%
  |
  |
  |-
  |-
  |Final touch
  |Final touch
  |  
  | 100%
  |
  | Ready to rumble!
|}
|}


Zeile 152: Zeile 130:
  |-
  |-
  |Evaluate the state of the current wiring
  |Evaluate the state of the current wiring
  |  
  |100%
  |
  |Existing in-wall wires should be cut off and forgotten about
  |-
  |-
  |Decide on techincal solution wrt. circuits, fuses, earth leakage breaker etc.
  |Decide on technical solution wrt. circuits, fuses, earth leakage breaker etc.
  |  
  |100%
  |
  |We have 3 x 16A + a FI dedicated to the WEL already in place
  |-
  |-
  |Decide on lighting solution
  |Decide on light & power solution
  |  
  |100%
  |
  |
  |-
  |-
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |Aquire the necessary equipment (lamps, cables, channels, outlets, switches etc.)
  |  
  |100%
  |
  |([http://www.orion.co.at/de/docs/stores/at/w1070.htm source for library/WEL lamps])
  |-
  |-
  |Build
  |Build
  |  
  |100%
  |
  |
  |-
  |-
  |Final touch
  |Final touch
  |  
  | 100%
  |
  |
|}
|}


= Plans & Ideas for Further Phases =
= Further Phases =
 
FIXME
 
 


* Make heavy machinery lab closable to limit dust -> done (new room)
* More outlets in the remaining corners of the lab -> partially done
* Permanent network cabling -> done
* More (and orderly) shelving
* Fixed and labeled positions for oszis, soldering stations, etc
* Stairs to the big window (since Hvy Mchnry exit will be unusable for a while)






[[Kategorie:Räume]] [[Kategorie:WhateverLab]]